Construction of Water Tower & Installation of a Grundfos Solar Pump with Lithium Battery Backup

Delivering a Reliable Solar-Powered Water Supply System in Tiko

NORWEGIAN REFUGEE COUNCIL Tiko, Buea Jan 5, 2025 — Feb 3, 2025
Overview

About the project

To improve access to reliable water, Evergreen Group of Companies carried out the construction of a reinforced water tower and installed a high-performance Grundfos solar pump with a lithium battery backup system in Tiko. The project was designed to provide a steady water supply using clean solar energy while ensuring continuous operation even when sunlight is limited. By combining durable civil works with advanced solar pumping technology, the system delivers an efficient, low-maintenance, and cost-effective solution for long-term water supply. This project highlights our commitment to providing sustainable infrastructure that meets the growing water needs of homes, businesses, and institutions

Delivery

Project timeline

    The team

    Who delivered it

    MF

    Mewoabi Fritz

    CEO & Managing Director

    Founder & CEO. A decade leading engineering delivery across renewable energy, telecom, and infrastructure.

    ME

    Marie-Claire Etogo

    Director of Construction

    Leads our general contracts and construction practice. PMP-certified; ex-Bouygues.

    EK

    Emmanuel Kondé

    Head of Renewable Energy

    Solar PV systems engineer. 8 MW+ of installed capacity delivered.

    Partners

    With

    Gallery

    On site

    Images and video from the project.

    Have a project like this?

    Tell us your scope and timeline — a senior lead will respond within one business day.